Client: Sandyford Luas Depot
Location: Sandyford, Dublin
Objective: To provide energy-efficient lighting for a new extension & upgrade their current dated lighting
Installer: O’Neill Mechanical & Electrical Services
As a result of the green & red Luas lines becoming connected, a longer fleet of trams was required to accommodate the increased passenger numbers. The Sandyford depot
needed to be extended to accommodate this.
Around the world, light rail transit (LRT) has become the symbol of a revival in public transportation. With around 400 systems already running in 50 countries and another 260 being built or on the drawing board, light rail is enjoying a new golden age in cities eager to promote more sustainable travel solutions. Passengers overwhelmingly support a major shift back to a transit system transformed by high-end design and the highest standards of service. Yet LRT does more than just modernise mobility: it also breathes new life into the urban environment.
Luas is a classic example of this. Luas has breathed new life into Dublin City and is loved by all her citizens. An alternative to cars in cities, light rail provides speed, frequency, on-time performance, and accessibility. The name Luas is the Irish word for speed. This tram system connects suburban parts of Dublin on two tramlines, which run through the city centre.
These tramlines are:
The whole site featured high-quality Southgate Lighting fittings as follows:
Southgate Lighting was originally established in 1965 as a Metal Fabrication company. It soon became a well-known and recognised manufacturer producing high quality, high volume UK manufactured components. In 1990 the company specialised in producing lighting and hence Southgate Lighting was formed.
Specialising in the manufacture of a comprehensive range of Industrial and Commercial products enhanced with professional lighting control systems.
Southgate only use Tridonic and Osram gear, which puts them in a position to offer a 5-year on-site warranty on projects; taking the responsibility away from the contractor for maintenance work!
In the unlikely event that a luminaire fails within the first 7 years Southgates’ own Ex-Or & Tridonic Trained Engineers will attend site and replace the faulty component free of charge.